Multifamily development glossary
The terms that come up in every multifamily project, defined in one place.
Approvals
- Entitlement: the approval of a specific project on a specific site.
- By right: allowed under the zone without a discretionary decision, where every standard is met.
- Ministerial: decided on objective standards, with no discretion and, in California, outside CEQA.
- Discretionary: decided by a body that can approve, condition or deny, usually after a hearing.
- Ready to issue (RTI): plan check approved and every clearance signed, so the permit can issue.
Capacity
- Density: the units permitted per acre or per area of lot.
- Floor area ratio (FAR): the building's floor area divided by the lot area.
- Test fit: a drawn floor plan that proves how many units a site holds.
- Set-aside: the share of units restricted for income-qualified households.
- Area median income (AMI): the income level set-asides are measured from.
Returns
- Net operating income (NOI): revenue less vacancy and operating expenses.
- Yield on cost: stabilized NOI divided by the total development cost.
- Cap rate: NOI divided by value, the rate at which the market prices income.
- Total development cost: land, hard cost, soft cost, financing and contingency.
Questions
- What does RTI mean in construction permitting?
- Ready to issue: plan check is approved and every clearance is signed, so the building permit can issue.
Sources
These guides summarize the code text for general information and are not legal advice. Every site is read under the code, the overlays and the ordinances that apply to it on the day of preparation.
TECTO GROUP takes multifamily sites through these pathways for owners, from the first study through entitlement and design to a permit ready to issue. Send the address of the site under consideration.